BWzKH Hospital: System, IT & Electrical Technology

Challenge

Low-current and high-current components, distributors, IT technology, system technology, specialization to meet the requirements 

Solution

A well-coordinated project team with very short service paths provides the following services:

  • New installation of the entire electrical installation in the new surgical and functional building

  • Video surveillance

  • 2800 KNX devices

  • 4 low-voltage main distribution boards (87 panels)

  • BSV systems

  • UPS systems

  • Server cabinets

  • House alarm

  • Patient/nurse call system

  • Intercom system incl. video technology

  • Helipad

  • Lighting systems and lights

  • Network and IT technology

  • Network connections (approx. 21,000)

  • Splicing work

  • Data cables (approx. 270 km)

  • IT tablets

 

Client

Landesbetrieb Liegenschafts- und Baubetreuung Rheinland-Pfalz, Koblenz branch (LBB NL Koblenz)

Realisation
We are here for you!
Rudolf Fritz GmbH