Hybrid power plant for GE Energy Power Conversion GmbH

Challenge

Planning, construction and operation of a hybrid power plant - combination of CHP with PVA, storage solutions and conversion of all secondary plants.

Solution

  • Planning, construction and operation of a hybrid power plant: CHP, PVA, innovative battery solution.
  • Control through EM system and comprehensive operation management
  • Conversion of secondary systems: renewal of pumps, ventilation systems and heat insulation, hydr. balancing and lighting optimization
Client

GE Energy Power Conversion GmbH

Realisation
03

Key Facts

  • Contract period: 15 years
  • CHP: 400 kWel, 491 kWth
  • Photovoltaics: 621 kWp, 6,900 modules,
  • World's first plant with a system voltage of (DC) 1.5 kV
  • Battery storage: storage capacity 200 kW, 154 battery modules
  • Heat storage: 25 m³, serves 8 consumption circuits
  • CO2 savings: approx. 2,208 t/year