Märkische Kiste Berlin

Challenge

Planning and implementation of CO2-saving measures: Lighting optimisation, PV system, pellet boiler system

Solution

Replacement of the T8 lamps with LEDs, planning and construction of a pellet boiler system, flue gas system, external pellet store, dismantling of the gas systems and the gas grid connection.

Client

Märkische Kiste GmbH

Realisation
04

Key Facts

  • Electricity consumption reduced by 72
  • PV generation of 21 MWh/a, of which 17 MWh/a own consumption
  • 32 kW pellet boiler and 9-tonne pellet store
  • 100 % renewable heat generation
  • CO2 savings of 87 % (13 t)
  • Maintenance, service and repair for the PV system