Märkische Kiste Berlin
Challenge
Planning and implementation of CO2-saving measures: Lighting optimisation, PV system, pellet boiler system
Solution
Replacement of the T8 lamps with LEDs, planning and construction of a pellet boiler system, flue gas system, external pellet store, dismantling of the gas systems and the gas grid connection.
Client
Märkische Kiste GmbH
Realisation
Key Facts
- Electricity consumption reduced by 72
- PV generation of 21 MWh/a, of which 17 MWh/a own consumption
- 32 kW pellet boiler and 9-tonne pellet store
- 100 % renewable heat generation
- CO2 savings of 87 % (13 t)
- Maintenance, service and repair for the PV system